Underground power in Wangaratta and surrounding country areas.
We supply and install underground power, including design for voltage drop and current draw. We own our own trenching equipment, a Kanga digger with a range of attachments, so trenching and backfill are done in-house. There is no waiting on a third-party digger and no separate quotes to coordinate.

600mm
the best-practice cover we go to where possible, above the 500mm minimum we always meet
Our own
Kanga digger and attachments, so we trench as well as wire
150mm
narrow trench, packed in tight with our wheeled digger
4
electricians, so an urgent job can be fitted in
Jobs we do underground
- 1
New houses: consumer mains from the pit or pole to the main switchboard
- 2
Farm pumps, from a house or shed down to a dam
- 3
Submains from the house to a shed, a very common job
- 4
Power out to a swimming pool or an electric gate
Our own digger, and someone we know can use it
We own our digger outright: a Kanga, with a range of attachments for different ground and different jobs. When we dig, it is our own Australian-made machine, and the person on it is someone we know can use it. Because we dig the trench ourselves, we get the depth we want, we can dig at short notice, and we can work with the weather. There is no misunderstanding between the person digging and the person wiring.
Depth and a narrow trench
The Australian Standard is 500mm of cover to the top of the conduit, and we always meet it. We follow best practice, which is 600mm, so where possible we go to 600mm or more. Our trench is a narrow 150mm (6 inches) wide. Once it is filled in, a narrow trench in softer ground is less likely to bog a car, and it packs in tight with our wheeled digger, which leaves less sinkage over time.
The right cable, for now and for later
We select the conduit and cable under the Australian Standards, and size the cable to Australian Standard 3008, working out its current-carrying capacity and the voltage drop. Voltage drop is a pressure drop in the cable. Think of a garden hose: the longer it gets, the less water comes out the end at the same pressure. Cables work the same way. We also ask what you might run in future, because things change quickly. If there is even a slight chance, we talk through the cost of a bigger cable. Most of the cost is labour and materials, so stepping up a cable size costs little compared with redoing the work later.
Knowing what is already underground
- 1
We carry out Before You Dig requests, so we know where the services are
- 2
Where locations are unclear, we have underground locating done, which gives depths and exact positions of gas, NBN and mains cables
- 3
Near a located asset we hand dig until we see it, so we never dig through it by accident
- 4
We take care around pipes, and always talk to you about the outcome at the end of the job
While the trench is open
- 1
Share the trench with your plumber, so you do not pay for trenching twice
- 2
Run a phone, NBN or data conduit alongside the power, with pull-wire if needed
- 3
Run power now for future gate openers, sheds or a fridge at the gate
- 4
Run "just in case" wiring: an extra wire now costs very little compared with coming back
Power, water and phone in one trench
A lot of people do not realise that power, water and communications can share a single trench. They go in at different depths, with the spacing between services that the Australian Standards require. We can install them for you, or work with your plumber and your phone or internet provider so everything goes in at once.
Marker tape and a diagram in your switchboard
We lay orange marker tape on all our cables, and we draw you a diagram in your switchboard so the cables can be located in the future.
At the end of the job
We backfill, roll the trench in tight with the digger, and leave a slight mound. A slight mound allows for settling, and after a few months and some rain it usually ends up level. If there is any sinkage it is generally only at the very ends, which we press in with our feet and hand tools to keep it to a minimum. We leave the job looking neat.
A set quote and a set date
Because we know our own equipment and process, we can quote accurately upfront and lock in an exact date and time, with a price that will not change on the day.
Urgent? We will fit you in
There are four of us, and many of our customers have been with us a long time. If a farmer has lost water to a trough, we talk to our other customers and move work around to get you sorted. In the bush everyone understands that in summer water comes first, and we never leave a customer in the lurch.
Before we arrive
We will talk it through beforehand so vehicles are out of the way and we have access. If something is in the way, we will tell you what needs to happen, or we are happy to do it for you, from moving items to pruning a tree. Some people like to do what they can to save money. If you are short on time, we can make it happen.
Power to the front gate.
One customer sells flowers from their front gate. We ran power down to the gate and through the fridge at the same time. They wanted room for more later, possibly a coffee machine, so we relocated the main switchboard to the gate rather than trenching back from the house. They now have full power at the gate for the fridge, future expansion, or plugging a caravan in when family visit.

The cable nobody knew was there.
A customer in Benalla had major electrical problems, with very big voltage drops pointing to a broken neutral in the power company's cable. It took about 12 weeks to fix. It turned out a live underground cable had been dug through. A Before You Dig request would have shown the power company asset and avoided the damage. It is why we do a Before You Dig request on our own jobs, and have underground locating done where we are unsure.
Questions about underground power in Wangaratta.
Do you own your own trenching equipment?
Yes. We own a Kanga digger and a range of attachments, so we dig the trench ourselves and wire it in the same job. For underground power on a farm or a block around Wangaratta, Wodonga and the rest of Northeast Victoria, you deal with one electrical contractor, not an electrician plus a separate earthmover.
Do you do the trenching yourselves?
Yes. We use our own digger, and the person on it is someone we know can use it. That means no waiting on a third-party digger and no separate quotes to coordinate.
How deep and how wide is the trench?
The Australian Standard is 500mm of cover to the top of the conduit, and we always meet it. We follow best practice, which is 600mm, so where possible we go to 600mm or more. Our trench is a narrow 150mm (6 inches) wide, which packs in tight with our wheeled digger and is less likely to bog a car once it is filled in.
Do you check for other services before you dig?
Yes. We carry out Before You Dig requests so we know where the services are, and where locations are unclear we have underground locating done. Near a located asset we hand dig until we see it, so we never dig through it by accident.
Can water and phone go in the same trench as the power?
Yes. They go in at different depths, with the spacing between services that the Australian Standards require. We can install them for you, or work with your plumber and your phone or internet provider so everything goes in at once.
How quickly can you dig a trench?
There are four of us, and many of our customers have been with us a long time. If a farmer has lost water to a trough, we talk to our other customers and move work around to get you sorted. In the bush everyone understands that in summer water comes first.
What do I get at the end of the job?
Orange marker tape goes over every cable, and we draw you a diagram in your switchboard so the cables can be located in future. We roll the trench in tight and leave a slight mound, which settles level after a few months and some rain.
Electrical work in Victoria is regulated by Energy Safe Victoria. Buchan Electrical is a Registered Electrical Contractor, #16499.
Get a free quote
Tell Lachlan what needs doing and where. Text is best: he will always reply.